Categories: Papers

Effect of Varying Ramp Angle and Leading-Edge Bluntness on the Behavior of Ramp Induced Shock Wave over Triple Ramped Cone Flare Configuration at Hypersonic Speed

Abstract: Numerical simulation results are presented to show the effect of ramp angle variations and leading-edge
bluntness on the flow around triple ramped cone flare in hypersonic flow. This study investigates the changes associated with shock wave boundary layer interaction due to ramp induced flow breakdown and the fluctuation in flow in the presence of blunted leading edge. This type of ramp junctions typically features in re-entry vehicles, engine intakes, system and subsystem junctions, control surfaces, etc. Ramp junctions usually are associated with strong separation bubble that has significant upstream influence impacting the effectiveness of aerodynamic surfaces, engine performance, thermal behavior and stability.

Computation studies are carried out using finite volume-based RANS solver, accuracy of second order and considering compressible laminar flow characteristics, with solver settings provided similar to experimental conditions as per literature. Comprehensive double ramp studies with suggestions on reducing the separation bubble size are invariantly considered in literature, however there has been no study in understanding the
inclusion of additional ramps in such flow scenarios, hence efforts are taken to understand the benefits and implications of including a third ramp along with varying bluntness on the bubble size and its upstream intensity.

Keywords: Hypersonic, Leading edge bluntness, ramp angle, Shock wave and boundary layer interactions

International Journal of Recent Technology and Engineering; Volume-8 Issue-3, September 2019, Page No: 8127-8138, ISSN: 2277-3878; Karthik Sundarraj, Ugur Guven, P.S. Kulkarni, Om Prakash, Ganesh Pawar R.; https://www.ijrte.org/wp-content/uploads/papers/v8i3/C5844098319.pdf

admin

Share
Published by
admin

Recent Posts

Chandrayaan 3: The Conquereor of the Lunar South Pole

Well if we’re looking into the superpowers of space the Indian Space Research Organization (ISRO)…

8 months ago

The International Lunar Research Station is Being Formalised

In June 2021, Russia and China announced the formation of the ILRS, with the goal…

1 year ago

ISRO Chandrayaan 3 Lunar Mission Launch is Targeting July 2023

Chandrayaan 3 Mission Launch Date is Approaching As part of an ongoing series of standard…

1 year ago

Artemis II Crew is Picked for Manned Mission to the Moon

NASA has picked its team for the Artemis II mission, which the first step in…

1 year ago

Astronauts who will be Launched on Artemis 2 Manned Lunar Mission are Announced

In the Artemis II Manned Lunar Mission, 4 astronauts comprised of 3 Americans and 1…

1 year ago

OneWeb Launch by Indian Space Agency ISRO Shows High Potential

An Indian rocket by ISRO launched and deployed 36 OneWeb satellites on Sunday, marking the…

1 year ago